Skip to content
Tutorials Center
My learning

Topics

Lesson 28 of 37 ยท Finance and Cash Flow

Costs, Revenue and Break-Even

Learn fixed and variable costs, revenue, profit, contribution and the break-even point with worked examples, a margin of safety, and a runnable break-even plot.

How many cups of coffee must a cafe sell before it makes any profit? Questions like this are answered with break-even analysis. It combines three ideas: costs, revenue and profit.

Costs

Fixed costs do not change with output in the short run: rent, insurance, salaries of permanent staff, loan interest.

Variable costs rise with output: ingredients, packaging, hourly wages for extra production.

total costs = fixed costs + variable costs variable costs = variable cost per unit ร— quantity

Revenue and profit

revenue = price ร— quantity profit = revenue - total costs

If profit is negative it is a loss.

Contribution

Contribution per unit = selling price - variable cost per unit. It is the amount each unit contributes toward paying fixed costs and then profit.

Worked example. A juice bar sells a smoothie for $5. Ingredients and cup cost $2 per smoothie. Contribution = 5 - 2 = $3. Monthly fixed costs are $2,400.

The break-even point

The break-even point is the quantity at which total revenue equals total costs, so profit is zero.

break-even quantity = fixed costs / contribution per unit

For the juice bar: 2,400 / 3 = 800 smoothies a month. Below 800 it makes a loss; above 800 a profit. The break-even revenue is 800 ร— $5 = $4,000.

Margin of safety

The margin of safety is how far actual sales exceed break-even:

margin of safety = actual output - break-even output

If the bar sells 1,000 smoothies, its margin of safety is 200 smoothies (20% of actual sales). Larger margins mean sales can fall further before losses begin.

The break-even chart

flowchart LR
  A["Fixed costs<br/>horizontal line"] --> D["Total costs<br/>start at fixed costs and slope up"]
  B["Variable costs<br/>rise with output"] --> D
  D --> E["Revenue line<br/>starts at 0"]
  E --> F["Break-even point<br/>where lines cross"]

On a chart the revenue line meets the total-cost line at the break-even point.

Let us draw it.

Python Break-even chart

Press Run (or Ctrl + Enter) to see the result here.

Program input ยท what you'd type while the program runs

Type the answers before you press Run, one per line. Each time the program reads a line (with input()), it gets the next line from this box.

Using break-even to test decisions

Managers ask "what if" questions:

  • Price rises to $6: contribution becomes 4, break-even = 2,400 / 4 = 600. But fewer customers might buy.
  • Rent rises by $300: fixed costs 2,700, break-even = 900.
  • Cheaper ingredients cut variable cost to $1.50: contribution 3.50, break-even = 685.7, so 686 smoothies (always round up).
JS Break-even calculator

Press Run (or Ctrl + Enter) to see the console output here.

No output.

Limits of break-even analysis

  • It assumes everything sells at one price and that costs rise in a straight line. Real firms give discounts and costs jump.
  • It assumes all output is sold, so stock is ignored.
  • It uses forecasts, which can be wrong.
  • Fixed costs are only fixed over a range of output; a bigger kitchen needs more rent.

It is still a quick, useful tool for new products and loan applications.

Check your understanding

Quick check ยท 4 questions

of 4 answered You scored / 4 ยท perfect!

  1. 1. Fixed costs are $6,000, price is $20 and variable cost is $8 per unit. What is the break-even quantity?

    Contribution = 12, so 6,000 / 12 = 500 units.
  2. 2. Which is a variable cost for a bakery?

    Flour use rises with the number of loaves.
  3. 3. If a firm sells 700 units and break-even is 500, what is the margin of safety?

    700 - 500 = 200.
  4. 4. What happens to break-even if fixed costs rise and nothing else changes?

    More units are needed to cover higher fixed costs.

Summary

  • Total cost = fixed + variable; profit = revenue - total cost.
  • Contribution per unit = price - variable cost.
  • Break-even quantity = fixed costs / contribution per unit.
  • Margin of safety = actual output - break-even output.
  • Break-even analysis is simple but rests on assumptions.

Next: Cash Flow Forecasts