Lesson 11 of 36 ยท ERP Modules Overview

SAP PP, QM and PM: Production Planning, Quality and Plant Maintenance

Learn SAP production planning (BOM, routing, MRP, production orders), quality management (inspection lots, usage decisions) and plant maintenance (equipment, notifications, work orders).

Manufacturing companies need three more modules next to finance and logistics: PP to plan and run production, QM to check quality, and PM to keep machines working. They all rely on the material master and plant structure you met earlier. This lesson explains the master data, the planning logic (MRP) and the document flow of each module.

Production Planning (PP)

Master data

Object Meaning T-code
Bill of materials (BOM) The components and quantities needed to make one unit of a product CS01 / CS03
Work center A machine or group of workers where operations happen, with capacity and cost rates CR01 / CR03
Routing The ordered operations (steps) to make the product, each at a work center with times CA01 / CA03
Material master (MRP views) Planning parameters: lot size, lead time, safety stock MM01
flowchart TD
    B["Bike (finished product)"] --> F["Frame x1"]
    B --> W["Wheel x2"]
    B --> S["Saddle x1"]
    W --> R["Rim x1"]
    W --> T["Tire x1"]
    W --> SP["Spokes x32"]

A multi-level bill of materials: wheels are sub-assemblies with their own components.

MRP: material requirements planning

MRP answers: what do we need, how much, and when? It runs per plant (transaction MD01 for the whole plant, MD02 for a single material, MD04 to view the stock/requirements list). The logic:

  1. Take requirements: sales orders, forecasts, safety stock.
  2. Subtract available stock and planned receipts (open purchase orders, production orders).
  3. If a shortage remains, create a planned order (for in-house production) or a purchase requisition (for external procurement) for the right quantity, with the lead time subtracted from the due date.
  4. For make items, explode the BOM and repeat the logic for every component.
Python Stand-in: a one-level MRP calculation

Press Run (or Ctrl + Enter) to see the result here.

Program input ยท what you'd type while the program runs

Type the answers before you press Run, one per line. Each time the program reads a line (with input()), it gets the next line from this box.

Production order flow

For an in-house product, MRP creates a planned order, which is converted into a production order (CO01 create, CO02 change, CO03 display). The production order:

  1. Reserves the components from the BOM.
  2. Releases so work can start.
  3. Is printed as shop papers and confirmed (CO11N) as operations finish, reporting yield, scrap and times.
  4. Goods issue posts consumption of components (MIGO movement type 261).
  5. Goods receipt puts the finished goods into stock (movement type 101).
  6. Settlement moves the order's costs to the product's valuation in finance.

The costs collected on a production order (material, labor, machine time) are what controlling later compares with the planned cost, as you will see in product costing.

Production types are chosen per business need: discrete manufacturing (production orders for single batches), repetitive manufacturing (continuous flow, period backflush), and process manufacturing (recipes, batches, chemical or food industry).

Quality Management (QM)

QM makes quality checks part of the process so that bad goods are stopped early.

Concept Meaning
Inspection characteristic A property to check, for example length or pH
Inspection plan The list of characteristics with tolerances for a material
Inspection lot A request to inspect a quantity at a certain event (goods receipt, production, delivery)
Results recording Entering measured values (QE01)
Usage decision Accept, reject or accept with a note, which releases or blocks the stock (QA11)
Quality notification A complaint or defect record (QM01)

The usual path: a goods receipt triggers an inspection lot; the stock goes to quality inspection stock; an inspector records results; the usage decision moves the stock to unrestricted use or to blocked stock. This ties MM and QM together: you cannot use goods in production until the decision is made.

Python Stand-in: inspection lot and usage decision

Press Run (or Ctrl + Enter) to see the result here.

Program input ยท what you'd type while the program runs

Type the answers before you press Run, one per line. Each time the program reads a line (with input()), it gets the next line from this box.

Plant Maintenance (PM)

PM manages technical objects and the work done on them.

  • Functional location: a place in the plant structure, such as "Building A / Line 2".
  • Equipment: a physical object installed there, such as a pump (IE01).
  • Maintenance notification: a report of a fault or request (IW21).
  • Maintenance order: the planned work with operations, spare parts and costs (IW31).
  • Maintenance plan: preventive tasks repeated by time or counter (for example every 500 operating hours).

Types of maintenance: breakdown (repair after failure), preventive (scheduled), and condition-based (triggered by measurement).

Python Stand-in: a maintenance plan scheduler

Press Run (or Ctrl + Enter) to see the result here.

Program input ยท what you'd type while the program runs

Type the answers before you press Run, one per line. Each time the program reads a line (with input()), it gets the next line from this box.

A maintenance order collects the costs of labor, spare parts and external services on a cost object, which is later settled to a cost center, so PM links to CO just like PP.

Check your understanding

Quick check ยท 4 questions

of 4 answered You scored / 4 ยท perfect!

  1. 1. What does a bill of materials list?

    A BOM lists the components for one unit of a product.
  2. 2. What does MRP create for a shortage of an in-house made part?

    Make parts get planned orders; bought parts get purchase requisitions.
  3. 3. What decides whether stock in inspection becomes usable?

    The usage decision releases accepted stock or blocks rejected stock.
  4. 4. A maintenance plan repeating every 500 hours is what kind of maintenance?

    Scheduled tasks by time or counter are preventive maintenance.

Summary

  • PP uses BOMs, work centers and routings; MRP turns demand into planned orders and requisitions.
  • Production orders reserve components, issue goods, receive finished goods and settle costs.
  • QM uses inspection lots and usage decisions to release or block stock.
  • PM manages equipment, notifications, orders and maintenance plans, and posts costs to CO.

Next: Procure to pay flow